Guillotine Cutting Machine Maintenance: Daily, Weekly and Monthly Checklist

Guillotine Cutting Machine Maintenance: Daily, Weekly and Monthly Checklist

Planned maintenance supports cut consistency, knife life, energy use and operator safety. It does more than prevent breakdowns.

Use this as a planning framework and follow the machine manual and site procedures. Isolate and lock out energy before maintenance.

Daily checks

Remove fibre and dust safely at shift end.

  • Check the knife area for foreign objects
  • Test guards, emergency stops and safety sensors
  • Inspect belt damage and tracking
  • Record noise, vibration or leakage
  • Inspect a cut sample

Weekly checks

Early detection of a small edge defect allows planned sharpening.

  • Inspect edges, clearance and fasteners
  • Confirm conveyor tension and centring
  • Check lubrication points
  • Clean sensors and inspect cables
  • Look for loose connections

Monthly and periodic work

Increase frequency for abrasive or dusty materials.

  • Inspect motors, gearboxes and bearings
  • Check panel connections with qualified staff
  • Record safety circuit tests
  • Measure belt and knife alignment
  • Review critical spare stock

Maintenance records

Record date, hours, material, symptom, action, replaced part and responsible person. Trends reveal root causes and upcoming spare needs.

Maintenance: Explore the MBS-800 or contact technical service.